Current Projects

Durham, N.C. - $2.3M project to supply dry injection equipment on three coal fired boilers for MACT compliance.  Equipment is supplied to control SO2, HCL and Hg emissions.

Tennessee Wood Products MACT compliance project - $2.4M for complete design and construction to modify existing press room to meet new environmental guidelines.

Eastern Tennessee Regenerative Thermal Oxidizer rebuild - $1.5M for complete upgrades with new media and supports for existing RTO on a dryer at a wood products plant.

Chesapeake, Va. - $150K for FD and ID Fans used in the process of ash generated at coal fired power plant. 

Boiler MACT project in Central, S.C.$1.2M Particulate and HCL removal system that includes a 140,000 cfm scrubber serving (2) Coal Fired Boilers. Includes all breeching duct and reagent supply.

Recent Projects

Decatur, Ala. - $2M Thermal Oxidizer with heat exchangers, ID fans and stack, two systems for carbon fiber manufacturer.

Villa Rica, Ga.- $200K turnkey dust collection system for a food packaging plant including cartridge dust collector, ID fan, HEPA filter, ductwork and system design for 21 packaging machines. 

Sandersville, Ga.- $500K two baghouse collectors including partial system design for heat recovery of hot gases at a kaolin clay producer.

Riceboro, Ga. – $625K SO2 scrubber, boiler fans (FD, ID and FGR) and CEM System for new boiler project at a paper mill. 

Greenville, N.C. - $1.8M VOC abatement project that includes a 120,000 cfm Concentrator System, Regenerative Thermal Oxidizer (RTO), Heat Exchangers, and interconnecting ductwork. ATI also supplied the Stacks and a Part 60 Continuous Emissions Monitoring System. Structural Fiber Manufacturing.

Gaffney, S.C. - $850K VOC abatement system that includes a 60,000 cfm Regenerative Thermal Oxidizer (RTO) and MUG unit. ATI also provided the Specifications and Design for the Industrial Ventilation System. Automatic spray paint line.

Charleston, S.C. - $500K Rotary Valve Regenerative Thermal Oxidizer (RTO) with ID fan and exhaust stack to provide control voc emissions from manufacture of fiberglass mat to meet MACT standards.

Covington, Ga. - $1M Regenerative Thermal Oxidizer (RTO) to control 99% of haps discharged from sterilization operation.

Minneapolis, Minn. - $1M Waste Heat Boiler for steam production used in manufacture of ethanol.

Minneapolis, Minn. – $1M Baghouse to control particulate emissions created burning waste to manufacture steam for ethanol production.

Thomson, Ga. - $300K High efficiency cyclone collectors to control particulate emissions from dryer used in manufacture of particle board.

Recent Stack Projects

Ivanhoe, La. - $334K - 195’-0” x 10’-6” Dia. A-36 C.S. Stack with Dryer Exhaust Duct, Dampers and Expansion Joints for Carbon Black Producer.

Fitzgerald, Ga. - $200K - Turnkey Relocation of 90’-0” 316L SS Stack, Scrubber, Fan and Duct.

Mojave, Calif. - $65K - 123’-0” x 4’-4” Dia. Braced A-36 C.S. Stack for Cement Plant.

Pampa, Texas - $300K - 125’-0” x 9’-6” x 12’-6” Dia. Refractory Lined Carbon Steel Stack and 150’-0” x 12’-6” Dia. Refractory Lined Carbon Steel Stack for Use as a Thermal Oxidizer for Carbon Black Producer.

Los Angeles, Calif. - $130K - 125’-0” x 6’-10” Dia. A-36 Carbon Steel for a Fired Boiler at a Refinery.